Mattiazzi M~Petrovic U, 2010

Pubmed ID 20379744
Title Genetic interactions between a phospholipase A2 and the Rim101 pathway components in S. cerevisiae reveal a role for this pathway in response to changes in membrane composition and shape.
Authors M Mattiazzi, A Jambhekar, P Kaferle, J L Derisi, I Krizaj, U Petrovic
Abstract Modulating composition and shape of biological membranes is an emerging mode of regulation of cellular processes. We investigated the global effects that such perturbations have on a model eukaryotic cell. Phospholipases A(2) (PLA(2)s), enzymes that cleave one fatty acid molecule from membrane phospholipids, exert their biological activities through affecting both membrane composition and shape. We have conducted a genome-wide analysis of cellular effects of a PLA(2) in the yeast Saccharomyces cerevisiae as a model system. We demonstrate functional genetic and biochemical interactions between PLA(2) activity and the Rim101 signaling pathway in S. cerevisiae. Our results suggest that the composition and/or the shape of the endosomal membrane affect the Rim101 pathway. We describe a genetically and functionally related network, consisting of components of the Rim101 pathway and the prefoldin, retromer and SWR1 complexes, and predict its functional relation to PLA(2) activity in a model eukaryotic cell. This study provides a list of the players involved in the global response to changes in membrane composition and shape in a model eukaryotic cell, and further studies are needed to understand the precise molecular mechanisms connecting them.
Citation Mol. Genet. Genomics 2010; 283:519-30

Datasets

Download the list of datasets
Paper Phenotype Condition Reference Collection Tested mutants Data Details
Mattiazzi M~Petrovic U, 2010 growth (colony size) expression of the phospholipase A2 Atx [GAL] hap a N/A Discrete
Mattiazzi M~Petrovic U, 2010 growth (colony volume) expression of the phospholipase A2 Atx [GAL] hap a 4,103 Quantitative

Curation history

Tested strains

Jan. 31, 2018 To request.
Feb. 1, 2018 Request sent.
Feb. 13, 2018 Ready to load.
Feb. 20, 2018 Loaded.

Data

Jan. 31, 2018 To request.
Feb. 1, 2018 Request sent.
Feb. 13, 2018 Ready to load.
Feb. 20, 2018 Loaded.